Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Evaluation of severe accident risks for plant operational state 5 during a refueling outage. Main report and appendices, Volume 6, Part 1

Technical Report ·
DOI:https://doi.org/10.2172/32555· OSTI ID:32555
; ; ;  [1];  [2];  [3]
  1. Sandia National Labs., Albuquerque, NM (United States)
  2. Science Applications International Corp., Albuquerque, NM (United States)
  3. GRAM, Inc., Albuquerque, NM (United States)

Traditionally, probabilistic risk assessments (PRAS) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Recent studies and operational experience have, however, implied that accidents during low power and shutdown could be significant contributors to risk. In response to this concern, in 1989 the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The program consists of two parallel projects being performed by Brookhaven National Laboratory (Surry) and Sandia National Laboratories (Grand Gulf). The program objectives include assessing the risks of severe accidents initiated during plant operational states other than full power operation and comparing the estimated risks with the risk associated with accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program is that of a Level-3 PRA. The subject of this report is the PRA of the Grand Gulf Nuclear Station, Unit 1. The Grand Gulf plant utilizes a 3833 MWt BUR-6 boiling water reactor housed in a Mark III containment. The Grand Gulf plant is located near Port Gibson, Mississippi. The regime of shutdown analyzed in this study was plant operational state (POS) 5 during a refueling outage, which is approximately Cold Shutdown as defined by Grand Gulf Technical Specifications. The entire PRA of POS 5 is documented in a multi-volume NUREG report (NUREG/CR-6143). The internal events accident sequence analysis (Level 1) is documented in Volume 2. The Level 1 internal fire and internal flood analyses are documented in Vols 3 and 4, respectively.

Research Organization:
Nuclear Regulatory Commission, Washington, DC (United States). Div. of Systems Technology; Sandia National Labs., Albuquerque, NM (United States)
Sponsoring Organization:
Nuclear Regulatory Commission, Washington, DC (United States)
DOE Contract Number:
AC04-94AL85000
OSTI ID:
32555
Report Number(s):
NUREG/CR--6143-Vol.6-Pt.1; SAND--93-2440-Vol.6-Pt.1; ON: TI95009319
Country of Publication:
United States
Language:
English