Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Life-cycle cost and impacts: alternatives for managing KE basin sludge

Technical Report ·
DOI:https://doi.org/10.2172/325411· OSTI ID:325411

This document presents the results of a life-cycle cost and impacts evaluation of alternatives for managing sludge that will be removed from the K Basins. The two basins are located in the 100-K Area of the Hanford Site. This evaluation was conducted by Fluor Daniel Hanford, Inc. (FDH) and its subcontractors to support decisions regarding the ultimate disposition of the sludge. The long-range plan for the Hanford Site calls for spent nuclear fuel (SNF), sludge, debris, and water to be removed from the K East (KE) and K West (KW) Basins. This activity will be conducted as a removal action under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The scope of the CERCLA action will be limited to removing the SNF, sludge, debris, and water from the basins and transferring them to authorized facilities for interim storage and/or treatment and disposal. The scope includes treating the sludge and water in the 100-K Area prior to the transfer. Alternatives for the removal action are evaluated in a CERCLA engineering evaluation/cost analysis (EE/CA) and include different methods for managing sludge from the KE Basins. The scope of the removal action does not include storing, treating, or disposing of the sludge once it is transferred to the receiving facility and the EE/CA does not evaluate those downstream activities. This life-cycle evaluation goes beyond the EE/CA and considers the full life-cycle costs and impacts of dispositioning sludge.

Research Organization:
Fluor Daniel Hanford, Inc., Richland, WA (United States)
Sponsoring Organization:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
325411
Report Number(s):
HNF-SD-SNF-TA--015; ON: DE99050046; BR: EW7050000
Country of Publication:
United States
Language:
English

Similar Records

EFFECTIVE ENVIRONMENTAL COMPLIANCE STRATEGY FOR THE CLEANUP OF K BASINS AT HANFORD SITE WASHINGTON
Conference · Tue Nov 30 23:00:00 EST 2004 · OSTI ID:834859

SNF sludge treatment system preliminary project execution plan
Technical Report · Mon Mar 02 23:00:00 EST 1998 · OSTI ID:362403

Idaho Cleanup Project CPP-603A basin deactivation waste management 2007
Conference · Sun Jul 01 00:00:00 EDT 2007 · OSTI ID:21305402