Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

PUREX (SAMCONS) uninterruptible power supply (UPS) acceptance test procedure

Technical Report ·
DOI:https://doi.org/10.2172/325203· OSTI ID:325203
This Acceptance Test Procedure for the PUREX Surveillance and Monitoring and Control System (SAMCONS) Uninterruptible Power Supply (UPS) provides for testing and verifying the proper operation of the control panel alarms and trouble functions, the 6roper functioning of the AC inverter, ability of the battery supply to maintain the SAMCONS load for a minimum of two hours , and proper interaction with the SAMCONS Video graphic displays for alarm displays.
Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
325203
Report Number(s):
HNF-SD-CP-ATP--091; ON: DE99050265; BR: EW7050000
Country of Publication:
United States
Language:
English

Similar Records

PUREX SAMCONS uninterruptible power supply (UPS) acceptance test report
Technical Report · Tue Oct 07 00:00:00 EDT 1997 · OSTI ID:344976

Autonomous uninterruptible power-supply apparatus
Patent · Wed Dec 19 23:00:00 EST 1984 · OSTI ID:5835771

Method and apparatus for line power monitoring for uninterruptible power supplies
Patent · Tue Jul 20 00:00:00 EDT 1993 · OSTI ID:6411117