skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Proven clean coal technology at work: The Provence 250 MW CFB boiler

Conference ·
OSTI ID:324720
 [1]; ;
  1. GEC Alsthom Stein Industrie, Velizy (France)

The successful start-up, in the last months of 1995, of the 250 MW Provence/Gardanne unit represents a significant milestone in the development of atmospheric Circulating Fluidized Bed (CFB) boilers for power stations. This high performance unit (over 700 tonnes/hour of steam at 169 bar, 567 C, with reheat at 566 C) has been in operation since April 1996. It is the first CFB boiler in the world to reach such a capacity. CFB boilers, with their excellent SO{sub 2} and NOx emission control capability, are today recognized as a very attractive Clean Coal Technology, particularly because of their simplicity. The Provence/Gardanne project is part of a French development program for large CFB boilers which has been elaborated in the perspective of domestic applications (mainly future semi-base load units) and of the overseas market. It responds to the converging interests of Electricite de France (EDF), Charbonnages de France (CdF)and GEC ALSTHOM Stein Industrie. Besides comprehensive R and D-type investigations aiming at an in-depth understanding of the CFB process and preparing for future scale-up and development, this program has already been marked by two outstanding commercial repowering projects: a 125 MW unit, in operation since 1990 at the Emile Huchet Power Station, and the 250 MW Provence unit. These boilers have been designed and supplied by GEC ALSTHOM Stein Industrie in the framework of their long standing cooperation with Lurgi, a pioneer of the CFB process. The main components are: (1) Furnace; (2) Cyclone; (3) Back-pass; (4) Ash cooler; (5) External Heat Exchanger. However, a brief discussion of some key design options affecting bed performance is necessary to better understand this technology. The paper describes the design of the system, the retrofitting project at Emile Huchet/Carling, and then gives background information on the Provence/Gardanne retrofit, describing SO{sub 2} emissions, the 250 MW boiler, and results from the performance tests. The recent performance tests as well as the operating experience already accumulated demonstrates that the Provence Clean Energy Project participants have successfully overcome the scale-up challenge represented by the construction of the first 250 MW CFB boiler in the world. This simple and attractive clean coal technology is now ready for many commercial applications in power stations. Units up to 300-400 MW can be built right now, using the lessons learned at Provence. Development of 600 MW-class CFB boilers, subcritical or supercritical, appears within reach in the near future.

OSTI ID:
324720
Report Number(s):
CONF-970931-; TRN: IM9911%%417
Resource Relation:
Conference: 14. annual international Pittsburgh coal conference and workshop: clean coal technology and coal utilization, Taiyuan (China), 23-27 Sep 1997; Other Information: PBD: 1997; Related Information: Is Part Of Fourteenth annual international Pittsburgh coal conference and workshop: Proceedings; PB: [1500] p.
Country of Publication:
United States
Language:
English