Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Rough order of magnitude cost estimate for immobilization of 18.2 MT of plutonium sharing existing facilities at Hanford with MOX fuel fabrication facility: alternative 4B/011

Technical Report ·
DOI:https://doi.org/10.2172/314060· OSTI ID:314060
The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 18.2 metric tons (nominal) of plutonium as a ceramic in an existing facility at Hanford, the Fuels and Materials Examination Facility (FMEF). The MOX Fuel Fabrication Facility (MFFF), which is being costed in a separate report, will also be located in the FMEF in this co-location option.
Research Organization:
Lawrence Livermore National Lab., CA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
W-7405-ENG-48
OSTI ID:
314060
Report Number(s):
UCRL-ID--131071; ON: DE98058786; BR: GA0102011
Country of Publication:
United States
Language:
English