Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Authorization basis requirements comparison report

Technical Report ·
DOI:https://doi.org/10.2172/312806· OSTI ID:312806
The TWRS Authorization Basis (AB) consists of a set of documents identified by TWRS management with the concurrence of DOE-RL. Upon implementation of the TWRS Basis for Interim Operation (BIO) and Technical Safety Requirements (TSRs), the AB list will be revised to include the BIO and TSRs. Some documents that currently form part of the AB will be removed from the list. This SD identifies each - requirement from those documents, and recommends a disposition for each to ensure that necessary requirements are retained when the AB is revised to incorporate the BIO and TSRs. This SD also identifies documents that will remain part of the AB after the BIO and TSRs are implemented. This document does not change the AB, but provides guidance for the preparation of change documentation.
Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
312806
Report Number(s):
HNF-SD-WM-RPT--303; ON: DE99050160; BR: EW3120071
Country of Publication:
United States
Language:
English

Similar Records

The PM/S module and the BIO/TSR requirements comparison report summary
Technical Report · Tue Feb 23 23:00:00 EST 1999 · OSTI ID:781542

Technical safety requirements control level verification
Technical Report · Fri May 21 00:00:00 EDT 1999 · OSTI ID:782336

Hazard evaluation for 244-AR vault facility
Technical Report · Wed Aug 25 00:00:00 EDT 1999 · OSTI ID:797700