Report and analysis of the BULLION forced-gradient experiment

Technical Report ·
DOI:https://doi.org/10.2172/305939· OSTI ID:305939

The BULLION Forced-Gradient Experiment (FGE) was conducted in the summer of 1997, starting June 2 and ending August 28. The site of the experiment was the ER-20-6 well field adjacent to the BULLION test. Figure 1-1 shows the location of this site on Pahute Mesa in Area 20 of the Nevada Test Site. Figure 1-2 shows the ER-20-6 site within the Pahute Mesa hydrogeologic framework, and Figure 1-3 shows the site layout with respect to the BULLION test. The purpose of the BULLION FGE was to provide information relevant to the transport of radionuclides in groundwater. Transport of radionuclides from Pahute Mesa is of special concern due to the potential for rapid movement of groundwater in the fractured volcanic rocks comprising the Mesa and formations along the anticipated downgradient path of groundwater. The objective was specifically to observe the transport process and characterize transport parameters (e.g., effective porosity, dispersivity and matrix diffusion) for use in predictive modeling of contaminant transport. Additional objectives were to characterize the hydrologic source term and the relative mobility of mobile radionuclides.

Research Organization:
It Corporation / Las Vegas (United States)
DOE Contract Number:
AC08-97NV13052
OSTI ID:
305939
Report Number(s):
DOE/NV/13052--042; ON: DE98059414
Country of Publication:
United States
Language:
English