Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Corrective action plan for CAU 426: Cactus Spring Waste Trenches, Tonopah Test Range

Technical Report ·
DOI:https://doi.org/10.2172/304050· OSTI ID:304050

This Corrective Action Plan (CAP) provides the selected corrective action alternative and proposes the closure implementation methodology for the Cactus Spring Waste Trenches Corrective Action Unit (CAU) No. 426. The site is located on the Tonopah Test Range (TTR), approximately 225 kilometers (km) (140 miles) northwest of Las Vegas, Nevada. The US Department of Energy/Nevada Operations Office (DOE/NV) verbally requested approval for the schedule to be accelerated from the Nevada Division of Environmental Protection (NDEP) in July 1997. Currently, field closure activities are anticipated to be completed by September 30, 1997. CAU 426 consists of one Corrective Action Site (CAS) comprised of four waste trenches. The trenches were excavated to receive solid waste generated in support of Operation Roller Coaster, primarily the Double Tracks Test in 1963.

Research Organization:
Bechtel Nevada, Inc., Las Vegas, NV (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC08-96NV11718
OSTI ID:
304050
Report Number(s):
DOE/NV/11718--153; ON: DE99001399
Country of Publication:
United States
Language:
English