Design of a GammaT-Jump System for Fermilab Booster
- Fermilab
A gammaT scheme may be required for the PIP-II era performance or ACE-MIRT era performance of the Booster. PIP-II era operations of the Fermilab proton complex will require the Fermilab Booster to increase beam intensity from 4.5e12 to 6.5e12 protons, while also increasing its ramp from 15 Hz to 20 Hz. These changes pose particular challenges for transition-crossing in the Booster, where longitudinal beam quality must be controlled in order to facilitate slip-stacking in the Recycler Ring later in the Main Injector cycle. Two novel gammaT jump schemes are proposed, termed double gammaT jump and partial gammaT jump, which optimizes the magnitude of the gammaT jump within optics and power supply constraints.
- Research Organization:
- Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- US Department of Energy
- DOE Contract Number:
- 89243024CSC000002
- OSTI ID:
- 3019371
- Report Number(s):
- FERMILAB-POSTER-25-0204-AD; oai:inspirehep.net:2963492
- Resource Type:
- Conference poster
- Conference Information:
- Journal Name: No journal information
- Country of Publication:
- United States
- Language:
- English
Similar Records
Design of a GammaT-Jump System for Fermilab Booster
IOTA experiment for proton pulse compression at extreme space-charge
Transition Crossing in the Main Injector for PIP-II
Conference
·
Tue Feb 10 19:00:00 EST 2026
· No journal information
·
OSTI ID:3017905
IOTA experiment for proton pulse compression at extreme space-charge
Conference
·
Tue Jan 27 19:00:00 EST 2026
· JACoW
·
OSTI ID:3020056
Transition Crossing in the Main Injector for PIP-II
Conference
·
Sat Dec 31 23:00:00 EST 2016
·
OSTI ID:1433199