Shift Validation Plan for CASL
- Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States)
This document outlines the benchmarks that will be used for Shift validation for CASL. This plan is divided into five main types of problems, with each building upon the previous: small criticality benchmark problems, including small reactor configurations and critical assemblies; full-core reactor benchmarks for light water reactors; fixed source coupled neutron-photon dosimetry benchmarks; depletion/burnup benchmarks ranging from small pincell problems to full-core reactor depletion; and full-core reactor performance benchmarks. Some of these benchmarks have measured data for comparison and some only have simulated Monte Carlo radiation transport code results for comparison. Upon completion of this validation plan, we will have confidence in Shift to provide reference results for CASL benchmarking.
- Research Organization:
- Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States)
- Sponsoring Organization:
- USDOE Office of Nuclear Energy (NE)
- DOE Contract Number:
- AC05-00OR22725
- OSTI ID:
- 3004262
- Report Number(s):
- CASL-U--2016-1192-000
- Country of Publication:
- United States
- Language:
- English
Similar Records
Shift Verification and Validation
CASL Verification and Validation Plan
CASL Validation Data: An Initial Review
Technical Report
·
Wed Sep 07 00:00:00 EDT 2016
·
OSTI ID:1329768
CASL Verification and Validation Plan
Technical Report
·
Thu Jun 30 00:00:00 EDT 2016
·
OSTI ID:1431322
CASL Validation Data: An Initial Review
Technical Report
·
Fri Dec 31 19:00:00 EST 2010
·
OSTI ID:1017862