Re-START: The second operational test of the String Thermionic Assembly Research Testbed
- Sandia National Labs., Albuquerque, NM (United States)
- TEAM Specialty Services, Inc., Albuquerque, NM (United States)
- New Mexico Engineering Research Inst., Albuquerque, NM (United States)
The second operational test of the String Thermionic Assembly Research Testbed -- Re-START -- was carried out from June 9 to June 14, 1997. This test series was designed to help qualify and validate the designs and test methods proposed for the Integrated Solar Upper Stage (ISUS) power converters for use during critical evaluations of the complete ISUS bimodal system during the Engine Ground Demonstration (EGD). The test article consisted of eight ISUS prototype thermionic converter diodes electrically connected in series.
- Research Organization:
- Sandia National Labs., Albuquerque, NM (United States)
- Sponsoring Organization:
- USDOE Office of Financial Management and Controller, Washington, DC (United States)
- DOE Contract Number:
- AC04-94AL85000
- OSTI ID:
- 292839
- Report Number(s):
- SAND--98-0240C; CONF-980103--; ON: DE98002590
- Country of Publication:
- United States
- Language:
- English
Similar Records
START-3: Operational evaluations of the ISUS engine ground demonstration thermionic power system
START-3: Operational Evaluations of the ISUS Engine Ground Demonstration Thermionic Power System
Thermionic converters for an Integrated Solar Upper Stage (ISUS)
Journal Article
·
Thu Dec 31 23:00:00 EST 1998
· AIP Conference Proceedings
·
OSTI ID:700889
START-3: Operational Evaluations of the ISUS Engine Ground Demonstration Thermionic Power System
Conference
·
Thu Oct 08 00:00:00 EDT 1998
·
OSTI ID:763
Thermionic converters for an Integrated Solar Upper Stage (ISUS)
Conference
·
Mon Dec 30 23:00:00 EST 1996
·
OSTI ID:438817