Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Operating experience of Pyroflow boilers in a 250 MWe unit

Conference ·
OSTI ID:287971
;  [1]
  1. Pyropower Corp., San Diego, CA (United States)
The Cedar Bay Cogeneration project is a 250 MWe unit owned and operated by US Generating Company. This plant has one turbine rated at 250 MWe net which is supplied by three Pyroflow CFB boilers that operate in parallel while supplying a paper mill with steam on an uninterruptible basis. Compared to similar size CFB boilers the Cedar Bay boilers have certain unique features. First, these are reheat boilers which must continue to supply process steam even when the steam turbine is down. Second, the SO{sub 2} control operates at a very low Ca/S molar ratio by optimizing the process conditions and flyash reinjection. Third, the NO{sub x} reduction process utilizes aqueous ammonia injection. This paper presents the operating data at full load in terms of boiler efficiency, and the ability to limit gaseous emissions with minimum limestone and ammonia usage. Unique features relating to the multiple boiler installation are also discussed.
OSTI ID:
287971
Report Number(s):
CONF-950522--; ISBN 0-7918-1305-3
Country of Publication:
United States
Language:
English