Leak detectability of the Norman Wells pipeline by mass balance
- Univ. of Idaho, Moscow, ID (United States). Dept. of Civil Engineering
Pipeline leak detection using software-based systems is becoming common practice. The detectability of such systems is measured by how small and how quickly a leak can be detected. Algorithms used and measurement uncertainties determine leak detectability. This paper addresses leak detectability using mass balance, establishes leak detectability for Norman Wells pipelines, and compares it with field leak test results. The pipeline is operated by the Interprovincial Pipe Line (IPL) Inc., of Edmonton, Canada. It is a 12.75-inch outside diameter steel pipe with variable wall thickness. The length of the pipe is approximately 550 miles (868.9 km). The pipeline transports light crude oil at a constant flow rate of about 250 m{sup 3}/hr. The crude oil can enter the pipeline at two locations. Besides the Norman Wells inlet, there is a side line near Zama terminal that can inject crude oil into the pipeline.
- OSTI ID:
- 287789
- Report Number(s):
- CONF-960154-; ISBN 0-9648731-8-4; TRN: IM9639%%409
- Resource Relation:
- Conference: Energy Week `96: American Society of Mechanical Engineers and American Petroleum Institute energy week conference and exhibition, Houston, TX (United States), 21 Jan - 2 Feb 1996; Other Information: PBD: 1996; Related Information: Is Part Of Energy week `96: Conference papers. Book 2: Pipelines, terminals and storage; PB: 239 p.
- Country of Publication:
- United States
- Language:
- English
Similar Records
Pipeline enhances Norman Wells potential
Norman Wells oil line to be wintertime projects