A 10-GeV, 5-MW proton source for a muon-muon collider
- Argonne National Laboratory, Argonne, Illinois 60439 (United States)
The performance parameters of a proton source which produces the required flux of muons for a 2-TeV on 2-TeV muon collider are: a beam energy of 10 GeV, a repetition rate of 30 Hz, two bunches per pulse with 5{times}10{sup 13} protons per bunch, and an rms bunch length of 3 nsec (1). Aside from the bunch length requirement, these parameters are identical to those of a 5-MW proton source for a spallation neutron source based on a 10-GeV rapid cycling synchrotron (RCS) (2). The 10-GeV synchrotron uses a 2-GeV accelerator system as its injector, and the 2-GeV RCS is an extension of a feasibility study for a 1-MW spallation source described elsewhere (3{endash}9). A study for the 5-MW spallation source was performed for ANL site-specific geometrical requirements. Details are presented for a site-independent proton source suitable for the muon collider utilizing the results of the 5-MW spallation source study. {copyright} {ital 1996 American Institute of Physics.}
- Research Organization:
- Argonne National Laboratory (ANL), Argonne, IL
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- W-31109-ENG-38
- OSTI ID:
- 286494
- Report Number(s):
- CONF-9510295--
- Journal Information:
- AIP Conference Proceedings, Journal Name: AIP Conference Proceedings Journal Issue: 1 Vol. 372; ISSN 0094-243X; ISSN APCPCS
- Country of Publication:
- United States
- Language:
- English
Similar Records
A 10-GeV, 5-MW proton source for a muon-muon collider
A 10-GeV, 5-MW proton source for a pulsed spallation source
A 1- to 5-MW, RCS-based, short-pulse spallation neutron source
Conference
·
Sat Dec 30 23:00:00 EST 1995
·
OSTI ID:219527
A 10-GeV, 5-MW proton source for a pulsed spallation source
Conference
·
Sat Dec 30 23:00:00 EST 1995
·
OSTI ID:201532
A 1- to 5-MW, RCS-based, short-pulse spallation neutron source
Conference
·
Sun Jun 01 00:00:00 EDT 1997
·
OSTI ID:495837