Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Implementation of Waste Minimization at a complex R&D site

Conference ·
OSTI ID:28398
 [1]; ;  [2]
  1. USDOE Chicago Operations Office, Argonne, IL (United States)
  2. Argonne National Lab., IL (United States)
Under the 1994 Waste Minimization/Pollution Prevention Crosscut Plan, the Department of Energy (DOE) has set a goal of 50% reduction in waste at its facilities by the end of 1999. Each DOE site is required to set site-specific goals to reduce generation of all types of waste including hazardous, radioactive, and mixed. To meet these goals, Argonne National Laboratory (ANL), Argonne, IL, has developed and implemented a comprehensive Pollution Prevention/Waste Minimization (PP/WMin) Program. The facilities and activities at the site vary from research into basic sciences and research into nuclear fuel cycle to high energy physics and decontamination and decommissioning projects. As a multidisciplinary R&D facility and a multiactivity site, ANL generates waste streams that are varied, in physical form as well as in chemical constituents. This in turn presents a significant challenge to put a cohesive site-wide PP/WMin Program into action. In this paper, we will describe ANL`s key activities and waste streams, the regulatory drivers for waste minimization, and the DOE goals in this area, and we will discuss ANL`s strategy for waste minimization and it`s implementation across the site.
Research Organization:
Argonne National Lab., IL (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
W-31109-ENG-38
OSTI ID:
28398
Report Number(s):
ANL/EMO/CP--85801; CONF-950216--67; ON: DE95008271
Country of Publication:
United States
Language:
English