Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Operating experience at CEBAF

Conference ·
OSTI ID:270664
CEBAF, the Continuous Electron Beam Accelerator Facility, is a 5-pass, recirculating, superconducting rf linac designed to provide exceptional beam quality at 4 GeV up to 200 {mu}A CW. It is made up of an injector, two 400-MeV linacs, and 9 recirculation arcs having a total beamline length of more than 4.5 km. On Nov. 5, 1995, CEBAF delivered a 4 GeV, 25-{mu}A CW electron beam to the first of 3 experimental halls and the experimental physics program was started 10 days later. Accelerator availability during the first month of the experimental run exceeded 75%. Beam properties measured in the experimental hall to date are a one sigma momentum spread of 5 x 10{sup -5} and an rms emittance of 0.2 nanometer-radians, better than design specification. CW beam has been provided from all 5 passes at 800 MeV intervals. Outstanding performance of the superconducting linacs suggests a machine energy upgrade to 6 GeV in the near term with eventual machine operation at 8-10 GeV. Results f rom commissioning and operations experience since the last conference are presented.
Research Organization:
Southeastern Universities Research Association, Inc., Newport News, VA (US); Continuous Electron Beam Accelerator Facility (US)
Sponsoring Organization:
USDOE, Washington, DC (US)
DOE Contract Number:
AC05-84ER40150
OSTI ID:
270664
Report Number(s):
DOE/ER/40150--370; CEBAF-PR--96-013; ON:DE96013212; ON: DE96013212
Country of Publication:
United States
Language:
English

Similar Records

Operating experience at CEBAF
Technical Report · Mon Jul 01 00:00:00 EDT 1996 · OSTI ID:10153669

CEBAF Commissioning Status
Conference · Thu Dec 31 23:00:00 EST 1992 · OSTI ID:954360

CEBAF: Project Status and Front End Test Results
Conference · Tue Sep 01 00:00:00 EDT 1992 · OSTI ID:954318