Vestas V60 - 1.5 MW wind turbine
Conference
·
OSTI ID:269379
- Vestas Wind Systems, Lem (Denmark)
The development of the large Vestas MW wind turbine began in December, 1992. The design project was {open_quotes}funded{close_quotes} by the EEC and should lead to the building of a prototype to be erected no later than September, 1995. The aim was to design a MW wind turbine competitive with medium size wind turbines (500 kW) on a $/kWh basis. The design is now finished and calculations show that the project has succeeded.
- Research Organization:
- American Wind Energy Association, Washington, DC (United States)
- OSTI ID:
- 269379
- Report Number(s):
- CONF-950309--; ON: DE96011159
- Country of Publication:
- United States
- Language:
- English
Similar Records
The 1.5 MW wind turbine of tomorrow
The Vestas Midwest Model wind turbine
Wind turbine operation and maintenance experience
Conference
·
Mon Dec 30 23:00:00 EST 1996
·
OSTI ID:447459
The Vestas Midwest Model wind turbine
Conference
·
Fri Sep 01 00:00:00 EDT 1995
·
OSTI ID:92984
Wind turbine operation and maintenance experience
Technical Report
·
Thu Jan 31 23:00:00 EST 1985
·
OSTI ID:5835095