Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Vestas V60 - 1.5 MW wind turbine

Conference ·
OSTI ID:269379
 [1]
  1. Vestas Wind Systems, Lem (Denmark)
The development of the large Vestas MW wind turbine began in December, 1992. The design project was {open_quotes}funded{close_quotes} by the EEC and should lead to the building of a prototype to be erected no later than September, 1995. The aim was to design a MW wind turbine competitive with medium size wind turbines (500 kW) on a $/kWh basis. The design is now finished and calculations show that the project has succeeded.
Research Organization:
American Wind Energy Association, Washington, DC (United States)
OSTI ID:
269379
Report Number(s):
CONF-950309--; ON: DE96011159
Country of Publication:
United States
Language:
English

Similar Records

The 1.5 MW wind turbine of tomorrow
Conference · Mon Dec 30 23:00:00 EST 1996 · OSTI ID:447459

The Vestas Midwest Model wind turbine
Conference · Fri Sep 01 00:00:00 EDT 1995 · OSTI ID:92984

Wind turbine operation and maintenance experience
Technical Report · Thu Jan 31 23:00:00 EST 1985 · OSTI ID:5835095