Physics of the AGS-to-RHIC transfer line commissioning
Conference
·
OSTI ID:266791
This paper presents beam physics results from the fall 1995 AGS-to- RHIC (ATR) transfer line commissioning run with fully ionized gold nuclei. We first describe beam position monitors and transverse video profile monitors, instrumentation relevant to measurements performed during this commissioning. Measured and corrected beam trajectories demonstrate agreement with design optics to a few percent, including optical transfer functions and beamline dispersion. Digitized 2- dimensional video profile monitors were used to measure beam emittance, and beamline optics and AGS gold ion beam parameters are shown to be comparable to RHIC design requirements.
- Research Organization:
- Brookhaven National Lab. (BNL), Upton, NY (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC02-76CH00016
- OSTI ID:
- 266791
- Report Number(s):
- BNL-62653; CONF-960621-14; ON: DE96012540; TRN: 96:017542
- Resource Relation:
- Conference: EPAC `96: 5. European particle accelerator conference, Barcelona (Spain), 10-14 Jun 1996; Other Information: PBD: [1996]
- Country of Publication:
- United States
- Language:
- English
Similar Records
AGS to RHIC transfer line: Design and commissioning
Design of the commissioning software for the AGS to RHIC transfer line
Physics of the AGS-to ?RHIC Transfer Line Commissioning
Conference
·
Sun Sep 01 00:00:00 EDT 1996
·
OSTI ID:266791
+1 more
Design of the commissioning software for the AGS to RHIC transfer line
Conference
·
Mon May 01 00:00:00 EDT 1995
·
OSTI ID:266791
+5 more
Physics of the AGS-to ?RHIC Transfer Line Commissioning
Technical Report
·
Sat Jun 01 00:00:00 EDT 1996
·
OSTI ID:266791
+25 more