Gas and liquid sampling for closed canisters in KW Basin - Work Plan
Work Plan for the design and fabrication of gas/liquid sampler for closed canister sampling in KW Basin. This document defines the tasks associated with the design, fabrication, assembly, and acceptance testing equipment necessary for gas and liquid sampling of the Mark I and Mark II canisters in the K-West basin. The sampling of the gas space and the remaining liquid inside the closed canisters will be used to help understand any changes to the fuel elements and the canisters. Specifically, this work plan will define the scope of work and required task structure, list the technical requirements, describe design configuration control and verification methodologies, detail quality assurance requirements, and present a baseline estimate and schedule.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-87RL10930
- OSTI ID:
- 26546
- Report Number(s):
- WHC-SD-SNF-WP--012; ON: DE95007225
- Country of Publication:
- United States
- Language:
- English
Similar Records
Gas liquid sampling for closed canisters in KW Basin - test plan
Gas liquid sampling for closed canisters in KW Basin: Test plan
Gas/liquid sampler for closed canisters in KW Basin - test report
Technical Report
·
Wed Jan 18 23:00:00 EST 1995
·
OSTI ID:10117301
Gas liquid sampling for closed canisters in KW Basin: Test plan
Technical Report
·
Tue Oct 04 00:00:00 EDT 1994
·
OSTI ID:10189606
Gas/liquid sampler for closed canisters in KW Basin - test report
Technical Report
·
Sun Jan 22 23:00:00 EST 1995
·
OSTI ID:26584