Modulation and SSR tests performed on the BPA 500 kV thyristor controlled series capacitor unit at Slatt substation

Journal Article · · IEEE Transactions on Power Systems
DOI:https://doi.org/10.1109/59.496157· OSTI ID:264248
 [1];  [2];  [3];  [4];  [5]
  1. Pacific Northwest Lab., Richland, WA (United States)
  2. Bonneville Power Administration, Portland, OR (United States)
  3. General Electric Co., Schenectady, NY (United States)
  4. Electric Power Research Inst., Palo Alto, CA (United States)
  5. Portland General Electric, OR (United States)

Field experience is reported for a thyristor controlled series capacitor (TCSC) recently commissioned at BPA`s Slatt substation. Subsynchronous resonance tests show that TCSC interactions with shaft dynamics of PGE`s Boardman steam generator are well understood and are effectively avoided by normal TCSC valve firing logic. Modulation tests, performed with the Boardman plant off line, show that the TCSC can be a powerful and responsive actuator for swing damping. Security considerations did not permit lightly damped operation of the controlled plant. Close analysis indicates that the TCSC damping contribution, though small, was measurable. The best estimate is that damping for the McNary mode is 7.33% and 8.55%, for the TCSC damper loop open and closed respectively. TCSC testing and monitoring is facilitated by an advanced interactive measurement network representing BPA`s approach to the information requirements of major control systems.

DOE Contract Number:
AC06-76RL01830
OSTI ID:
264248
Report Number(s):
CONF-950727--
Journal Information:
IEEE Transactions on Power Systems, Journal Name: IEEE Transactions on Power Systems Journal Issue: 2 Vol. 11; ISSN ITPSEG; ISSN 0885-8950
Country of Publication:
United States
Language:
English