Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Long Baseline Neutrino Facility (LBNF) Corrector Magnets

Technical Report ·
DOI:https://doi.org/10.2172/2568792· OSTI ID:2568792
 [1];  [2]
  1. Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
  2. Chinese Academy of Sciences (CAS), Beijing (China)
The Long Baseline Neutrino Facility (LBNF) includes at the Fermi National Accelerator Laboratory (Fermilab) site a Beamline which will aim neutrinos towards massive detectors at the Sanford Underground Research Facility (SURF) at South Dakota. The neutrinos will be created by a beam of 60-120 GeV protons extracted from Fermilab’s Main Injector interacting with a target located in the end of the LBNF proton beamline. The design of the proton beamline involves 79 conventional magnets; 23 are corrector magnets. These correctors are of a new design which evolved from those built for the Fermilab Main Injector. Following the production of a prototype corrector magnet by the Institute of High Energy Physics (IHEP) and its testing by both IHEP and Fermilab, IHEP will procure the materials for the 24 (including one spare) corrector magnets needed by the LBNF proton beamline; then, will build, test and certify them
Research Organization:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States); Chinese Academy of Sciences (CAS), Beijing (China)
Sponsoring Organization:
USDOE Office of Science (SC), High Energy Physics (HEP)
DOE Contract Number:
89243024CSC000002
OSTI ID:
2568792
Report Number(s):
FERMILAB-CRADA-FRA--2016-0046; FRA-2016-0046; oai:inspirehep.net:2929040
Country of Publication:
United States
Language:
English

Similar Records

Design of the LBNF Beamline
Conference · Sat Dec 31 23:00:00 EST 2016 · OSTI ID:1366519

Design of the LBNF Beamline
Conference · Sun Aug 30 00:00:00 EDT 2015 · OSTI ID:1223857

Design of the LBNF Beamline
Conference · Wed Jun 01 00:00:00 EDT 2016 · OSTI ID:1329063

Related Subjects