Surface-Water Monitoring Program, Rocky Mountain Arsenal, task plan 1995. Final draft report
The principal goals of the surface-water program are designed to: (1) Support the needs of clean-up activities at RMA; (2) Monitor surface-water flow, storage, and quality on and around RMA; and (3) Provide timely and accurate data that will be appropriate to address issues such as water balance, surface- and ground-water interaction, and water management scenarios at RMA. The purpose of this task plan is to present and define the SWMP for fiscal year 1995 (FY95). The principal components of the SWMP are the surface-water network and operational methodologies used within the network. Additional components of the SWMP discussed in this task plan are reports produced by the program, quality-assurance and quality-control procedures for USGS field methods and for analytical support provided by the Laboratory Support Division of the Program Manager`s Office, data processing and management, and health and safety procedures used by USGS at RMA.
- Research Organization:
- Geological Survey, Boulder, CO (United States). Water Resources Div.
- OSTI ID:
- 256498
- Report Number(s):
- AD-A-305014/3/XAB; TRN: 61770659
- Resource Relation:
- Other Information: PBD: Oct 1994
- Country of Publication:
- United States
- Language:
- English
Similar Records
Air quality monitoring during building demolition activities at the Rocky Mountain Arsenal
Performance based vs. compliance based auditing: The similarities and the differences