Design criteria for lighting and controls modifications OSW, CTF, COS buildings
This project will retrofit the lighting systems in three (3) buildings at the Mound Plant. The buildings are Central Operational Support (COS), Component Test Facility (CTF) and operational Support West (OSW). This project consists of the installation of occupancy sensors in private offices, break areas and laboratories, automatic control lighting, (occupied/unoccupied) with the existing DDC system, removing selected light fixtures, replacing incandescent lighting and reprogramming some of the software controlling the operation of the air handling units in the a forementioned buildings.
- Research Organization:
- EG and G Mound Applied Technologies, Miamisburg, OH (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC24-88DP43495
- OSTI ID:
- 255000
- Report Number(s):
- MLM-MU--91-68-0004; ON: DE96012475
- Country of Publication:
- United States
- Language:
- English
Similar Records
Design criteria for OSW alternate power
Conventional and tubular skylights: An evaluation of the daylighting systems at two ACT{sup 2} commercial buildings
Zone Level Occupant-Responsive Building Energy Systems at the GSA
Technical Report
·
Sat Dec 31 23:00:00 EST 1988
·
OSTI ID:113766
Conventional and tubular skylights: An evaluation of the daylighting systems at two ACT{sup 2} commercial buildings
Conference
·
Tue Dec 30 23:00:00 EST 1997
·
OSTI ID:361853
Zone Level Occupant-Responsive Building Energy Systems at the GSA
Technical Report
·
Fri Feb 28 23:00:00 EST 2014
·
OSTI ID:1167377