Title: Conceptual design report for site drainage control

Abstract

The Mound Plant (Mound), located in Miamisburg, Ohio, is a Department of Energy (DOE) development and production facility performing support work for DOE`s weapons and energy-related programs. EG&G Mound Applied Technologies, Inc. (EG&G) is the Operating Contractor (OC) for this Government-Owned, Contractor-Operated (GOCO) facility. The work performed at Mound emphasizes nuclear energy and explosives technology. Mound is currently implementing an Environmental, Safety & Health (ES&H) Upgrades Program designed to protect its employees, the public, and the environment from adverse effects caused by facility activities. The first project of this multiphase program is now in the final stages of construction, and the second project is currently under design. Four additional projects, one of which is presented in this report, are in the conceptual design stage. At Mound, 22 soil zones have become contaminated with radioactive material. These zones cover approximately 20 percent of the total area of developed property at the site. During a storm event, the rainwater washes contaminated soil from these zones into the storm sewer system. These radioactive contaminants may then be discharged along with the stormwater into the Great Miami River via the Miami Erie Canal. This conceptual design report (CDR), Site Drainage Control, the fourth projectmore » in the ES&H program, describes a project that will provide improvements and much needed repairs to inadequate and deteriorating portions of the storm drainage system on the developed property. The project also will provide a stormwater retention facility capable of storing the stormwater runoff, from the developed property, resulting from a 100-year storm event. These improvements will permit the effective control and monitoring of stormwater to prevent the spread of radioactive contaminants from contaminated soil zones and will provide a means to collect and contain accidental spills of hazardous substances.« less

Authors:
Publication Date:
Research Org.:
EG and G Mound Applied Technologies, Miamisburg, OH (United States)
Sponsoring Org.:
USDOE, Washington, DC (United States)
OSTI Identifier:
254983
Report Number(s):
MLM-MU-91-62-0006
ON: DE96012498; TRN: 96:004021
DOE Contract Number:  
AC24-88DP43495
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: [1996]
Country of Publication:
United States
Language:
English
Subject:
54 ENVIRONMENTAL SCIENCES; 05 NUCLEAR FUELS; MOUND LABORATORY; REMEDIAL ACTION; RADIOISOTOPES; RADIOECOLOGICAL CONCENTRATION; SOILS; ENVIRONMENTAL TRANSPORT; CONTAMINATION; DRAINAGE; FLOOD CONTROL; MONITORING

Citation Formats

Hunter, M R. Conceptual design report for site drainage control. United States: N. p., 1996. Web. doi:10.2172/254983.
Hunter, M R. Conceptual design report for site drainage control. United States. https://doi.org/10.2172/254983
Hunter, M R. Mon . "Conceptual design report for site drainage control". United States. https://doi.org/10.2172/254983. https://www.osti.gov/servlets/purl/254983.
@article{osti_254983,
title = {Conceptual design report for site drainage control},
author = {Hunter, M R},
abstractNote = {The Mound Plant (Mound), located in Miamisburg, Ohio, is a Department of Energy (DOE) development and production facility performing support work for DOE`s weapons and energy-related programs. EG&G Mound Applied Technologies, Inc. (EG&G) is the Operating Contractor (OC) for this Government-Owned, Contractor-Operated (GOCO) facility. The work performed at Mound emphasizes nuclear energy and explosives technology. Mound is currently implementing an Environmental, Safety & Health (ES&H) Upgrades Program designed to protect its employees, the public, and the environment from adverse effects caused by facility activities. The first project of this multiphase program is now in the final stages of construction, and the second project is currently under design. Four additional projects, one of which is presented in this report, are in the conceptual design stage. At Mound, 22 soil zones have become contaminated with radioactive material. These zones cover approximately 20 percent of the total area of developed property at the site. During a storm event, the rainwater washes contaminated soil from these zones into the storm sewer system. These radioactive contaminants may then be discharged along with the stormwater into the Great Miami River via the Miami Erie Canal. This conceptual design report (CDR), Site Drainage Control, the fourth project in the ES&H program, describes a project that will provide improvements and much needed repairs to inadequate and deteriorating portions of the storm drainage system on the developed property. The project also will provide a stormwater retention facility capable of storing the stormwater runoff, from the developed property, resulting from a 100-year storm event. These improvements will permit the effective control and monitoring of stormwater to prevent the spread of radioactive contaminants from contaminated soil zones and will provide a means to collect and contain accidental spills of hazardous substances.},
doi = {10.2172/254983},
url = {https://www.osti.gov/biblio/254983}, journal = {},
number = ,
volume = ,
place = {United States},
year = {1996},
month = {7}
}