Progress in developing a superconducting accelerator for efficient eBeam and X-ray production
- Fermilab
The PIP-II Accelerator is an 800 MeV superconducting Linac in the injection chain of the Fermilab accelerator complex. The LLRF systems for the 125 cavities which include a few normal conducting cavities in the warm front-end section, use a variety of LLRF hardware components and sub-systems that are part of the timing and synchronization system. This includes a master oscillator and phase averaging reference line, a beam pattern generator to enable beam transfer between non-harmonic RF systems and beam loading compensation systems synchronized to a start of beam trigger. The timing signals are based on a 650 MHz clock with manchester encoded event information and data provided over optical fiber. The timing and synchronization systems and their performance parameters will be described here.
- Research Organization:
- Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 2474966
- Report Number(s):
- FERMILAB-SLIDES-24-0279-ETD; oai:inspirehep.net:2841790
- Country of Publication:
- United States
- Language:
- English
Similar Records
Timing and Synchronization in the LLRF systems of the Fermilab PIP-II Linac
Proton Improvement Plan II (PIP-II) Clock and Timing
LLRF System for the Fermilab PIP-II Superconducting LINAC
Conference
·
Mon Nov 04 23:00:00 EST 2024
·
OSTI ID:2476991
Proton Improvement Plan II (PIP-II) Clock and Timing
Conference
·
Wed Nov 06 23:00:00 EST 2024
·
OSTI ID:2476982
LLRF System for the Fermilab PIP-II Superconducting LINAC
Conference
·
Wed Nov 01 00:00:00 EDT 2023
·
OSTI ID:2217153