Short-term hydro generation and interchange contract scheduling for Swiss Rail
Journal Article
·
· IEEE Transactions on Power Systems
- Swiss Rail, Zollikofen (Switzerland)
- Siemens-Empros, Brooklyn Park, MN (United States)
- Frowd (Roderick J.), San Jose, CA (United States)
- Macro Corp., Mountain View, CA (United States)
This paper describes the Short-Term Resource Scheduling (STRS) function that has been developed by Siemens-Empros as part of the new SBB/Direktion Kraftwerk (Swiss Rail) Energy Management System. Optimal scheduling of the single-phase hydro plants, single-phase and three-phase energy accounts, and purchase and sale of three phase energy subject to a multitude of physical and contractual constraints (including spinning and regulating reserve requirements), is the main objective of the STRS function. The operations planning horizon of STRS is one day to one week using an hourly time increment.
- OSTI ID:
- 244755
- Report Number(s):
- CONF-950525--
- Journal Information:
- IEEE Transactions on Power Systems, Journal Name: IEEE Transactions on Power Systems Journal Issue: 1 Vol. 11; ISSN ITPSEG; ISSN 0885-8950
- Country of Publication:
- United States
- Language:
- English
Similar Records
Short-term hydro generation and interchange contract scheduling for Swiss Rail
Optimal hydro generation and interchange scheduling with flow-dependent channel constraints
A coordinated approach for real-time short term hydro scheduling
Conference
·
Sat Dec 30 23:00:00 EST 1995
·
OSTI ID:367368
Optimal hydro generation and interchange scheduling with flow-dependent channel constraints
Conference
·
Sat Dec 30 23:00:00 EST 1995
·
OSTI ID:438714
A coordinated approach for real-time short term hydro scheduling
Journal Article
·
Thu Oct 31 23:00:00 EST 1996
· IEEE Transactions on Power Systems
·
OSTI ID:435353