A practical resource scheduling with OPF constraints
Journal Article
·
· IEEE Transactions on Power Systems
- Illinois Inst. of Tech., Chicago, IL (United States). Dept. of Electrical and Computer Engineering
- Siemens Energy and Automation, Brooklyn Park, MN (United States)
This paper presents an efficient approach to short term resource scheduling based on the augmented Lagrangian relaxation method. The problem is divided into two stages, the commitment stage and the constrained economic dispatch stage. The proposed mathematical model incorporates optimal power flow (OPF) constraints in the unit commitment stage. OPF constraints refer to the relevant active power constraints that are incorporated in the constrained economic dispatch stage (i.e. transmission capacity constraints, fuel and various regulated emission requirements). The inclusion of OPF constraints in the commitment stage will improve the feasibility of the constrained economic dispath solution. Other unit commitment constraints such as spinning and operating reserve requirements, power balance as well as other relevant local constraints (i.e. unit ramping rates, upper and lower generation limits, minimum up and down times) are taken into account in the proposed model. As the authors deal with a larger number of constraints, a more rigorous method is introduced for updating Lagrange multipliers to improve the solution convergence. A software package which addresses energy management systems requirements is developed and tested.
- OSTI ID:
- 244752
- Report Number(s):
- CONF-950525--
- Journal Information:
- IEEE Transactions on Power Systems, Journal Name: IEEE Transactions on Power Systems Journal Issue: 1 Vol. 11; ISSN 0885-8950; ISSN ITPSEG
- Country of Publication:
- United States
- Language:
- English
Similar Records
A practical resource scheduling with OPF constraints
Short-term generation scheduling with transmission and environmental constraints using an augmented Lagrangian relaxation
Ramp-rate limits in unit commitment and economic dispatch incorporating rotor fatigue effect
Conference
·
Sat Dec 30 23:00:00 EST 1995
·
OSTI ID:367361
Short-term generation scheduling with transmission and environmental constraints using an augmented Lagrangian relaxation
Journal Article
·
Tue Aug 01 00:00:00 EDT 1995
· IEEE Transactions on Power Systems
·
OSTI ID:163022
Ramp-rate limits in unit commitment and economic dispatch incorporating rotor fatigue effect
Journal Article
·
Mon Aug 01 00:00:00 EDT 1994
· IEEE Transactions on Power Systems (Institute of Electrical and Electronics Engineers); (United States)
·
OSTI ID:6911495