Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Fermilab collider run 1b accelerator performance

Technical Report ·
DOI:https://doi.org/10.2172/244360· OSTI ID:244360
This report summarizes the performance of Run 1b as of the end of July 1995. This run is the conclusion of Fermilab Collider Run 1, which consists of Run 1a (May 1992 - May 1993) and Run 1b (January 1994 - February 1996). Run 1b is characterized by being the first with the new 400 MeV Linac. At this time the run is not complete. Colliding beam physics is scheduled to resume after the summer 1995 shut down and continue until mid-February 1996. All of the operation to date is at a Tevatron energy of 900 GeV. This report emphasizes performance numbers and the various improvements made to systems to achieve this performance. It will only discuss the underlying physics to a limited extent. The report is divided into sections on: run statistics, I&C issues, proton source performance, antiproton source performance, main ring performance, Tevatron performance, and a summary.
Research Organization:
Fermi National Accelerator Lab., Batavia, IL (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC02-76CH03000
OSTI ID:
244360
Report Number(s):
FNAL-TM--1970; ON: DE96011883
Country of Publication:
United States
Language:
English

Similar Records

Fermilab Collider: Performance and plans
Conference · Tue Nov 30 23:00:00 EST 1993 · OSTI ID:10115245

The Ssart of Run II at CDF
Conference · Mon Oct 28 23:00:00 EST 2002 · OSTI ID:803559

The status of Run II at Fermilab
Conference · Mon Oct 07 00:00:00 EDT 2002 · OSTI ID:802084