TPX: Contractor preliminary design review. Volume 1, Presentation and design description. Final report
- Everson Electric Co., Bekthlehem, PA (United States)
- Northrop Grumman Corp., Bethpage, NY (United States)
This first volume of the five volume set begins with a CPDR overview and then details the PF magnet system, manufacturing R&D, Westinghouse R&D, the central solenoid, the PF 5 ring coil, the PF 6/7 ring coil, quality assurance, and the system design description.
- Research Organization:
- Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Westinghouse Electric Corp., Sunnyvale, CA (United States); Northrop Grumman Corp., Bethpage, NY (United States); Everson Electric Co., Bethlehem, PA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- W-7405-ENG-48
- OSTI ID:
- 234649
- Report Number(s):
- UCRL-CR-121739-Vol.1; ON: DE96009505; TRN: 96:014246
- Resource Relation:
- Other Information: PBD: 22 Sep 1995
- Country of Publication:
- United States
- Language:
- English
Similar Records
TPX: Contractor preliminary design review. Volume 3, Design and analysis
TPX: Contractor preliminary design review. Volume 5, Manufacturing R&D
TPX: Contractor preliminary design review. Volume 2, PF systems engineering
Technical Report
·
Fri Jun 30 00:00:00 EDT 1995
·
OSTI ID:234649
TPX: Contractor preliminary design review. Volume 5, Manufacturing R&D
Technical Report
·
Fri Aug 04 00:00:00 EDT 1995
·
OSTI ID:234649
TPX: Contractor preliminary design review. Volume 2, PF systems engineering
Technical Report
·
Fri Jul 28 00:00:00 EDT 1995
·
OSTI ID:234649