Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Preliminary Transverse Shielding Analysis for the 1010-C RF Building

Technical Report ·
DOI:https://doi.org/10.2172/2315636· OSTI ID:2315636
 [1]
  1. Brookhaven National Laboratory (BNL), Upton, NY (United States)
EIC is planning to construct a new building on the outer ring berm at 10 o’clock which will provide RF power to cryogenically-cooled beam line components in the electron and hadron storage rings. The distance of the building from the RHIC Tunnel and the amount of soil shielding required are the focus of this report. Siting the building closer to the RHIC Tunnel is desirable from an RF operations viewpoint since the waveguide runs and RF power losses will be minimized, but this may require the use of higher density shield materials, e.g., concrete, in addition to soil shielding. The radiological source terms are the prompt radiation hazards from the Hadron Storage Ring (HSR) and Electron Storage Ring (ESR) beam losses in the 10 o’clock sector and the lateral dose rates propagated through the shields. See Figure 1 below.
Research Organization:
Brookhaven National Laboratory (BNL), Upton, NY (United States)
Sponsoring Organization:
USDOE Office of Science (SC), Nuclear Physics (NP)
DOE Contract Number:
SC0012704
OSTI ID:
2315636
Report Number(s):
BNL--225333-2024-TECH; EIC-ADD-TN-087
Country of Publication:
United States
Language:
English

Similar Records

An Induction-Type Septum Magnet for the Hadron and Electron Injection of the EIC Complex
Technical Report · Thu Aug 01 00:00:00 EDT 2024 · OSTI ID:2428918

Thermal simulation of the EIC HSR interconnect module - RF fingers
Technical Report · Wed May 01 00:00:00 EDT 2024 · OSTI ID:2367449

Preliminary Shielding Analysis for the 1012 400 MeV Linac Building
Technical Report · Fri Sep 01 00:00:00 EDT 2023 · OSTI ID:2005154

Related Subjects