Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Los Alamos National Laboratory Floodplain Assessment for the TA-72 Guard Post 10 Expedited Vehicle Lane Project

Technical Report ·
DOI:https://doi.org/10.2172/2274913· OSTI ID:2274913
 [1]
  1. Los Alamos National Laboratory (LANL), Los Alamos, NM (United States)
The National Nuclear Security Administration (NNSA), a semi-autonomous agency within the U.S. Department of Energy (DOE), is proposing new construction in lower Sandia Canyon at Technical Area (TA) 72 at the Guard Post 10 vehicle inspection station at Los Alamos National Laboratory (LANL). The proposed project is intended to provide expedited inspection times for vehicles transporting time sensitive loads, such as concrete and asphalt. The project activities within the 100-year floodplain include installation of 1) installation of an expedited vehicle inspection lane, 2) relocation of a 4-strand wire fence, 3) possible relocation of at least one power pole, and 4) a laydown area (Figures 1 and 2).
Research Organization:
Los Alamos National Laboratory (LANL), Los Alamos, NM (United States)
Sponsoring Organization:
USDOE National Nuclear Security Administration (NNSA)
DOE Contract Number:
89233218CNA000001
OSTI ID:
2274913
Report Number(s):
LA-UR--23-33934
Country of Publication:
United States
Language:
English