Use of advanced analytical planning tools in the Toronto Integrated Electrical Service Study
Technical Report
·
OSTI ID:226960
- Ontario Hydro (Canada)
Ontario Hydro has adopted the local integrated resource planning (LIRP) approach as the methodology of choice for planning supply to a service area. Experience with a dozen or so LIRP studies so far in the last three years has demonstrated and confirmed the appropriateness of this planning approach under the current low load growth and cost conscious planning environment in Ontario Hydro. This report will summarize the experience of the Toronto Integrated Electrical Service (TIES) Study, the most complex and comprehensive of the LIRP studies carried out so far by Ontario Hydro. In particular, the tools, approaches and methods developed and used in this study will be highlighted.
- Research Organization:
- Electric Power Research Inst., Palo Alto, CA (United States); Barakat and Chamberlin, Inc., Oakland, CA (United States)
- OSTI ID:
- 226960
- Report Number(s):
- EPRI-TR--105791; CONF-9508115--
- Country of Publication:
- United States
- Language:
- English
Similar Records
Value-based need for local demand- and supply-side investments
Application of life cycle assessment methodology at Ontario Hydro
Acid aerosol transport episodes in Toronto, Ontario
Book
·
Sat Dec 30 23:00:00 EST 1995
·
OSTI ID:192227
Application of life cycle assessment methodology at Ontario Hydro
Conference
·
Mon Dec 30 23:00:00 EST 1996
·
OSTI ID:478368
Acid aerosol transport episodes in Toronto, Ontario
Technical Report
·
Wed Jul 01 00:00:00 EDT 1987
·
OSTI ID:6079778