Small modular reactor (SMR) development plan in Korea
Journal Article
·
· AIP Conference Proceedings
- Nuclear Transmutation Energy Research Center, Seoul National University, Bldg.31-1, 1 Gwanak-ro, Gwanak-gu, Seoul, Republic of Korea, 151-742 (Korea, Republic of)
Since the first nuclear power was engaged in Korean electricity grid in 1978, intensive research and development has been focused on localization and standardization of large pressurized water reactors (PWRs) aiming at providing Korean peninsula and beyond with economical and safe power source. With increased priority placed on the safety since Chernobyl accident, Korean nuclear power R and D activity has been diversified into advanced PWR, small modular PWR and generation IV reactors. After the outbreak of Fukushima accident, inherently safe small modular reactor (SMR) receives growing interest in Korea and Europe. In this paper, we will describe recent status of evolving designs of SMR, their advantages and challenges. In particular, the conceptual design of lead-bismuth cooled SMR in Korea, URANUS with 40∼70 MWe is examined in detail. This paper will cover a framework of the program and a strategy for the successful deployment of small modular reactor how the goals would entail and the approach to collaboration with other entities.
- OSTI ID:
- 22391609
- Journal Information:
- AIP Conference Proceedings, Journal Name: AIP Conference Proceedings Journal Issue: 1 Vol. 1659; ISSN APCPCS; ISSN 0094-243X
- Country of Publication:
- United States
- Language:
- English
Similar Records
Nuclear program of South Korea
Regulatory activities and severe accident research program in Korea
Nuclear Waste Attributes of SMRs Scheduled for Near-Term Deployment
Journal Article
·
Sun Feb 28 23:00:00 EST 1993
· NUEXCO. Monthly Report to the Nuclear Industry; (United States)
·
OSTI ID:7245452
Regulatory activities and severe accident research program in Korea
Journal Article
·
Fri Dec 30 23:00:00 EST 1994
· Transactions of the American Nuclear Society
·
OSTI ID:182077
Nuclear Waste Attributes of SMRs Scheduled for Near-Term Deployment
Technical Report
·
Thu Nov 17 23:00:00 EST 2022
·
OSTI ID:1900154