Dismantling of Highly Contaminated Process Installations of the German Reprocessing Facility (WAK) - Status of New Remote Handling Technology - 13287
Conference
·
OSTI ID:22225023
- WAK Rueckbau- und Entsorgungs- GmbH, P.O. Box 12 63, 76339 Eggenstein-Leopoldshafen (Germany)
Decommissioning and dismantling of the former German Pilot Reprocessing Plant Karlsruhe (WAK) including the Vitrification Facility (VEK) is being executed in different Project steps related to the reprocessing, HLLW storage and vitrification complexes /1/. While inside the reprocessing building the total inventory of process equipment has already been dismantled and disposed of, the HLLW storage and vitrification complex has been placed out of operation since vitrification and tank rinsing procedures where finalized in year 2010. This paper describes the progress made in dismantling of the shielded boxes of the highly contaminated laboratory as a precondition to get access to the hot cells of the HLLW storage. The major challenges of the dismantling of this laboratory were the high dose rates up to 700 mSv/h and the locking technology for the removal of the hot cell installations. In parallel extensive prototype testing of different carrier systems and power manipulators to be applied to dismantle the HLLW-tanks and other hot cell equipment is ongoing. First experiences with the new manipulator carrier system and a new master slave manipulator with force reflection will be reported. (authors)
- Research Organization:
- WM Symposia, 1628 E. Southern Avenue, Suite 9-332, Tempe, AZ 85282 (United States)
- OSTI ID:
- 22225023
- Report Number(s):
- INIS-US--13-WM-13287
- Country of Publication:
- United States
- Language:
- English
Similar Records
Concept for dismantling the Hllw treatment facility on the Former Wak Reprocessing Site
Dismantling of HLLW Process Installations of the German Reprocessing Facility (WAK) - Progress and first Experiences in Hot Application of Remote Techniques - 17083
The WAK decommissioning and dismantling program
Conference
·
Sun Jul 01 00:00:00 EDT 2007
·
OSTI ID:21290812
Dismantling of HLLW Process Installations of the German Reprocessing Facility (WAK) - Progress and first Experiences in Hot Application of Remote Techniques - 17083
Conference
·
Sat Jul 01 00:00:00 EDT 2017
·
OSTI ID:22794498
The WAK decommissioning and dismantling program
Conference
·
Mon Dec 30 23:00:00 EST 1996
·
OSTI ID:476522