Increasing the reliability of the shutdown of 500 - 750-kV overhead lines equipped with shunt reactors in an unsuccessful three-phase automatic repeated closure cycle
Journal Article
·
· Power Technology and Engineering (Print)
- JSC 'R and D Center at Federal Grid Company of the United Power System' (Russian Federation)
The reasons for circuit-breaker failures during repeated disconnection of 500 - 750 kV overhead lines with shunt reactors in a cycle of unsuccessful three-phase automatic reconnection (TARC) are analyzed. Recommendations are made for increasing the operating reliability of power transmission lines with shunt reactors when there is unsuccessful reconnection.
- OSTI ID:
- 22126497
- Journal Information:
- Power Technology and Engineering (Print), Vol. 47, Issue 1; Other Information: Copyright (c) 2013 Springer Science+Business Media New York; http://www.springer-ny.com; Country of input: International Atomic Energy Agency (IAEA); ISSN 1570-145X
- Country of Publication:
- United States
- Language:
- English
Similar Records
Tests of automatic reclosing on an industrial 750-kV line
Results from the introduction and operation of recording equipment for locating faults in 110-750 kV overhead power lines
Measurement of the electrical field at the Leningrad 750 kV substation
Journal Article
·
Tue Feb 01 00:00:00 EST 1977
· Sov. Power Eng. (Engl. Transl.); (United States)
·
OSTI ID:22126497
Results from the introduction and operation of recording equipment for locating faults in 110-750 kV overhead power lines
Journal Article
·
Fri Apr 01 00:00:00 EST 1983
· Sov. Power Eng. (Engl. Transl.); (United States)
·
OSTI ID:22126497
Measurement of the electrical field at the Leningrad 750 kV substation
Journal Article
·
Mon May 01 00:00:00 EDT 1978
· Sov. Power Eng. (Engl. Transl.); (United States)
·
OSTI ID:22126497