Title: Increasing the reliability of the shutdown of 500 - 750-kV overhead lines equipped with shunt reactors in an unsuccessful three-phase automatic repeated closure cycle

Journal Article · · Power Technology and Engineering (Print)
; ;  [1]
  1. JSC 'R and D Center at Federal Grid Company of the United Power System' (Russian Federation)

The reasons for circuit-breaker failures during repeated disconnection of 500 - 750 kV overhead lines with shunt reactors in a cycle of unsuccessful three-phase automatic reconnection (TARC) are analyzed. Recommendations are made for increasing the operating reliability of power transmission lines with shunt reactors when there is unsuccessful reconnection.

OSTI ID:
22126497
Journal Information:
Power Technology and Engineering (Print), Vol. 47, Issue 1; Other Information: Copyright (c) 2013 Springer Science+Business Media New York; http://www.springer-ny.com; Country of input: International Atomic Energy Agency (IAEA); ISSN 1570-145X
Country of Publication:
United States
Language:
English

Similar Records

Tests of automatic reclosing on an industrial 750-kV line
Journal Article · Tue Feb 01 00:00:00 EST 1977 · Sov. Power Eng. (Engl. Transl.); (United States) · OSTI ID:22126497

Results from the introduction and operation of recording equipment for locating faults in 110-750 kV overhead power lines
Journal Article · Fri Apr 01 00:00:00 EST 1983 · Sov. Power Eng. (Engl. Transl.); (United States) · OSTI ID:22126497

Measurement of the electrical field at the Leningrad 750 kV substation
Journal Article · Mon May 01 00:00:00 EDT 1978 · Sov. Power Eng. (Engl. Transl.); (United States) · OSTI ID:22126497