Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

River flow maintenance turbine for Milner Hydroelectric Development

Conference ·
OSTI ID:219969
The Milner Hydroelectric Project on the Snake River in Idaho was commissioned in 1992. The project included renovation of an existing dam, which was built to supply irrigation water to a canal system, construction of a new spillway, and the addition of a new powerhouse. The forebay of the main powerhouse is located on a combination power and irrigation canal, approximately 3500 feet (1070 m) from the dam, with a short tailrace returning the water to the river. There are two Kaplan turbines installed in the main powerhouse, rated at 1000 cfs and 4000 cfs respectively at a net head of 150 feet. The FERC license required that a target flow of 200 cfs be released from the dam to maintain a stream flow between the dam and the powerhouse. In order to utilize this flow, a small powerhouse was constructed at the toe of the dam. The site conditions favored a vertical axial flow turbine, with a net head of 56 feet. As the flow is constant and the head is fairly constant, a fixed geometry turbine was selected, to be controlled solely by the intake gate. Due to the higher head, the main powerhouse can generate more power per unit of flow than can the bypass turbine. Therefore, it is undesirable for the discharge of the bypass turbine to be any greater than required by the license. Also, the release flow is determined by a river gauge, the accuracy of which is unknown, but assumed to be within five percent. In order to meet these two requirements, the turbine was specified to have manually adjustable runner blades to obtain the required release flow of 200 cfs at any head between 55 and 58 feet.
OSTI ID:
219969
Report Number(s):
CONF-9507190--
Country of Publication:
United States
Language:
English

Similar Records

Getting two for one: Adding hydropower at the Milner Irrigation Dam
Journal Article · Thu Oct 01 00:00:00 EDT 1992 · Hydro Review; (United States) · OSTI ID:5498912

Reservoir and canal system regulation for operation of the Raymond Reservoir Hydro Project
Conference · Sat Dec 30 23:00:00 EST 1995 · OSTI ID:220165

Low-head Hydroelectric Power Demonstration Project: City of Gonzales, Texas. Final technical and construction cost report. [Utilization of old equipment]
Technical Report · Mon Dec 31 23:00:00 EST 1984 · OSTI ID:5736140