Minimum flow unit installation at the South Edwards Hydro Plant
Conference
·
OSTI ID:219967
- Niagara Mohawk Power Corporation, Syracuse, NY (United States)
Niagara Mohawk Power Corp. owns and operates the 3.3 MW South Edwards Hydro Plant in Northern New York. The FERC license for this plant requires a minimum flow release in the bypass region of the river. NMPC submitted a license amendment to the FERC to permit the addition of a minimum flow unit to take advantage of this flow. The amendment was accepted, permitting the installation of the 236 kw, 60 cfs unit to proceed. The unit was installed and commissioned in 1994.
- OSTI ID:
- 219967
- Report Number(s):
- CONF-9507190-; TRN: 96:000708-0049
- Resource Relation:
- Conference: Waterpower 1995: international conference, San Francisco, CA (United States), 25-28 Jul 1995; Other Information: PBD: 1995; Related Information: Is Part Of Waterpower`95. Volume 1-3; Cassidy, J.L. [ed.]; PB: 2869 p.
- Country of Publication:
- United States
- Language:
- English
Similar Records
Determining the minimum instream flow for hydro peaking projects
Fishin' for balance: Selecting minimum flow at hydro projects
Post license enhancements - passing minimum flows through outlet works and generators
Journal Article
·
Thu Oct 01 00:00:00 EDT 1992
· Hydro Review; (United States)
·
OSTI ID:219967
Fishin' for balance: Selecting minimum flow at hydro projects
Journal Article
·
Mon Feb 01 00:00:00 EST 1993
· Hydro Review; (United States)
·
OSTI ID:219967
Post license enhancements - passing minimum flows through outlet works and generators
Conference
·
Sun Dec 31 00:00:00 EST 1995
·
OSTI ID:219967