skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: General Electric ATS Program technical review Phase 2 activities

Conference ·
OSTI ID:218684
 [1];  [2]
  1. General Electric Co., Schenectady, NY (United States). Power Generation Div.
  2. General Electric Co., Schenectady, NY (United States). Corporate Research and Development Center

The Advanced Turbine Systems (ATS) Program Phase 2 objectives are to select a cycle, and to identify and resolve technical issues required to realize the ATS Program goals of 60% net combined cycle efficiency, single digit NOx, and a 10% electric power cost reduction, compared to current technology. The Phase 2 efforts have showns that the ATS Program goals are achievable. The GE Power Generation advanced gas turbine will use closed-loop steam cooling in the first two turbine stages and advanced coatings, seals and cooling designs to meet ATS performance and cost of electricity goals.

Research Organization:
General Electric Co., Schenectady, NY (United States). Power Generation Div.; General Electric Co., Schenectady, NY (United States). Corporate Research and Development Center
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC21-93MC30244
OSTI ID:
218684
Report Number(s):
DOE/MC/30244-96/C0644; CONF-9510109-3; ON: DE96008919
Resource Relation:
Conference: Advanced turbine systems (ATS) annual review, Morgantown, WV (United States), 17-18 Oct 1995; Other Information: PBD: [1995]
Country of Publication:
United States
Language:
English