Integrating the Clearance in NPP Residual Material Management
- Iberdrola Ingenieria y Construccion, Jose Bardasano Baos 28036, Madrid (Spain)
Previous Experiences in decommissioning projects are being used to optimize the residual material management in NPP, metallic scrap usually. The approach is based in the availability of a materials Clearance MARSSIM-based methodology developed and licensed in Spain. A typical project includes the integration of segregation, decontamination, clearance, quality control and quality assurance activities. The design is based in the clearance methodology features translating them into standard operational procedures. In terms of ecological taxes and final disposal costs, significant amounts of money could be saved with this type of approaches. The last clearance project managed a total amount of 405 tons scrap metal and a similar amount of other residual materials occupying a volume of 1500 m{sup 3}. After less than a year of field works 251 tons were finally recycled in a non-licensed smelting facility. The balance was disposed as LILW. In the planning phase the estimated cost savings were 4.5 Meuro. However, today a VLLW option is available in European countries so, the estimated cost savings are reduced to 1.2 Meuro. In conclusion: the application of materials clearance in NPP decommissioning lessons learnt to the NPP residual material management is an interesting management option. This practice is currently going on in Spanish NPP and, in a preliminary view, is consistent with the new MARSAME Draft. An interesting parameter is the cost of 1 m3 of recyclable scrap. The above estimates are very project specific because in the segregation process other residual materials were involved. If the effect of this other materials is removed the estimated Unit Cost were in this project around 1700 euro/m{sup 3}, this figure is clearly below the above VLLW disposal cost of 2600 euro. In a future project it appears feasible to descend to 839 euro/m{sup 3} and if it became routine values and is used in big Decommissioning projects, around 600 euro/m{sup 3} or below possibly could be achieved. A rough economical analysis permits to estimate a saving around 2000 US$ to 13000 US$ per cubic meter of steel scrap according the variability of materials and disposal costs. Many learnt lessons of this practice were used as a feed back in the planning of characterization activities for decommissioning a Spanish NPP and today are considered as a significant reference in our Decommissioning engineering approaches.
- Research Organization:
- American Nuclear Society, 555 North Kensington Avenue, La Grange Park, Illinois 60526 (United States)
- OSTI ID:
- 21144196
- Resource Relation:
- Conference: DD and R 2007: ANS Topical Meeting on Decommissioning, Decontamination, and Reutilization 2007, Chattanooga, TN (United States), 16-19 Sep 2007; Other Information: Country of input: France; 4 refs; Related Information: In: Proceedings of the 2007 ANS Topical Meeting on Decommissioning, Decontamination, and Reutilization - DD and R 2007, 336 pages.
- Country of Publication:
- United States
- Language:
- English
Similar Records
Jose Cabrera dismantling and decommissioning project
A 'Method Based Survey' Succeeds in a Spanish Scrap Clearance Project - 15664
Related Subjects
CLEARANCE
COST
DECOMMISSIONING
DECONTAMINATION
ENGINEERING
INTERMEDIATE-LEVEL RADIOACTIVE WASTES
LICENSES
LOW-LEVEL RADIOACTIVE WASTES
MANAGEMENT
NUCLEAR POWER PLANTS
PLANNING
QUALITY ASSURANCE
QUALITY CONTROL
SCRAP METALS
SEGREGATION
SMELTING
STEELS