Next Generation CANDU: Conceptual Design for a Short Construction Schedule

Conference ·
OSTI ID:21064554

Atomic Energy of Canada Ltd. (AECL) has very successful experience in implementing new construction methods at the Qinshan (Phase III) twin unit CANDU 6 plant in China. This paper examines the construction method that must be implemented during the conceptual design phase of a project if short construction schedules are to be met. A project schedule of 48 months has been developed for the nth unit of NG (Next Generation) CANDU with a 42 month construction period from 1. Concrete to In-Service. An overall construction strategy has been developed involving paralleling project activities that are normally conducted in series. Many parts of the plant will be fabricated as modules and be installed using heavy lift cranes. The Reactor Building (RB), being on the critical path, has been the focus of considerable assessment, looking at alternative ways of applying the construction strategy to this building. A construction method has been chosen which will result in excess of 80% of internal work being completed as modules or as very streamlined traditional construction. This method is being further evaluated as the detailed layout proceeds. Other areas of the plant have been integrated into the schedule and new construction methods are being applied to these so that further modularization and even greater paralleling of activities will be achieved. It is concluded that the optimized construction method is a requirement, which must be implemented through all phases of design to make a 42 month construction schedule a reality. If the construction methods are appropriately chosen, the schedule reductions achieved will make nuclear more competitive. (authors)

Research Organization:
The ASME Foundation, Inc., Three Park Avenue, New York, NY 10016-5990 (United States)
OSTI ID:
21064554
Country of Publication:
United States
Language:
English

Similar Records

Constructability -- from Qinshan to the ACR
Journal Article · Mon Sep 01 00:00:00 EDT 2003 · Nuclear Plant Journal · OSTI ID:820959

Cost and schedule reduction for next-generation Candu
Conference · Mon Jul 01 00:00:00 EDT 2002 · OSTI ID:21167899

Experience in the design of the CANDU 300 reactor
Conference · Mon Dec 31 23:00:00 EST 1984 · Trans. Am. Nucl. Soc.; (United States) · OSTI ID:5123967