Title: A Specific Long-Term Plan for Management of U.S. Nuclear Spent Fuel

Conference ·
OSTI ID:21021103
 [1]
  1. Levy and Associates, 3425 South Bascom Avenue, Suite 225, Campbell, CA 95008 (United States)

A specific plan consisting of six different steps is proposed to accelerate and improve the long-term management of U.S. Light Water Reactor (LWR) spent nuclear fuel. The first step is to construct additional, centralized, engineered (dry cask) spent fuel facilities to have a backup solution to Yucca Mountain (YM) delays or lack of capacity. The second step is to restart the development of the Integral Fast Reactor (IFR), in a burner mode, because of its inherent safety characteristics and its extensive past development in contrast to Acceleration Driven Systems (ADS). The IFR and an improved non-proliferation version of its pyro-processing technology can burn the plutonium (Pu) and minor actinides (MA) obtained by reprocessing LWR spent fuel. The remaining IFR and LWR fission products will be treated for storage at YM. The radiotoxicity of that high level waste (HLW) will fall below that of natural uranium in less than one thousand years. Due to anticipated increased capital, maintenance, and research costs for IFR, the third step is to reduce the required number of IFRs and their potential delays by implementing multiple recycles of Pu and Neptunium (Np) MA in LWR. That strategy is to use an advanced separation process, UREX+, and the MIX Pu option where the role and degradation of Pu is limited by uranium enrichment. UREX+ will decrease proliferation risks by avoiding Pu separation while the MIX fuel will lead to an equilibrium fuel recycle mode in LWR which will reduce U. S. Pu inventory and deliver much smaller volumes of less radioactive HLW to YM. In both steps two and three, Research and Development (R and D) is to emphasize the demonstration of multiple fuel reprocessing and fabrication, while improving HLW treatment, increasing proliferation resistance, and reducing losses of fissile material. The fourth step is to license and construct YM because it is needed for the disposal of defense wastes and the HLW to be generated under the proposed plan. The fifth step consists of developing a risk informed methodology to assess the various options available for disposition of LWR spent fuel and to select among them. The sixth step is to modify the current U. S. infrastructure and to create a climate to increase the utilization of uranium and the sustainability of nuclear generated electricity. (author)

Research Organization:
American Nuclear Society, 555 North Kensington Avenue, La Grange Park, IL 60526 (United States)
OSTI ID:
21021103
Resource Relation:
Conference: 2006 International congress on advances in nuclear power plants - ICAPP'06, Reno - Nevada (United States), 4-8 Jun 2006; Other Information: Country of input: France; 16 refs; Related Information: In: Proceedings of the 2006 international congress on advances in nuclear power plants - ICAPP'06, 2734 pages.
Country of Publication:
United States
Language:
English