AREVA Team Develops Sump Strainer Blockage Solution for PWRs
Conference
·
OSTI ID:21021036
- Areva NP, 7207 IBM Drive-Building 204-Mail Code CLT-2A-Charlotte, NC. 28262 (United States)
The purpose of this paper is to discuss the methodology, testing challenges, and results of testing that a team of experts from Areva NP, Alden Research Laboratory, Inc (ALDEN), and Performance Contracting Inc. (PCI) has developed. The team is currently implementing a comprehensive solution to the issue of Emergency Core Cooling System (ECCS) sump strainer blockage facing Pressurized Water Reactor (PWR) Nuclear Plants. The team has successfully demonstrated two key results from the testing of passive Sure-FlowTM strainers, which were designed to distribute the required flow over a large surface area resulting in extremely low approach velocities. First, the actual head loss (pressure drop) as tested, across the prototype strainers, was much lower than the calculated head loss using the Nuclear Regulatory Commission (NRC) approved NUREG/CR-6224 head loss correlation. Second, the penetration fractions were much lower than those seen in the NRC sponsored debris penetration tests. (author)
- Research Organization:
- American Nuclear Society, 555 North Kensington Avenue, La Grange Park, IL 60526 (United States)
- OSTI ID:
- 21021036
- Country of Publication:
- United States
- Language:
- English
Similar Records
The strainer blockage assessment methodology used
An overview of the BWR ECCS strainer blockage issues
Parametric Model of Debris Penetration Through Sump Strainers with Concurrent Filtration and Shedding
Conference
·
Thu Feb 29 23:00:00 EST 1996
·
OSTI ID:269678
An overview of the BWR ECCS strainer blockage issues
Conference
·
Thu Feb 29 23:00:00 EST 1996
·
OSTI ID:269675
Parametric Model of Debris Penetration Through Sump Strainers with Concurrent Filtration and Shedding
Technical Report
·
Mon Dec 31 23:00:00 EST 2012
·
OSTI ID:1059404