Plant Modernization with Digital Reactor Protection System Safety System Upgrades at US Nuclear Power Stations
Conference
·
OSTI ID:21021030
- AREVA NP, an AREVA and Siemens Company, 1345 Ridgeland Parkway, Suite 130 (United States)
As the current fleet of nuclear power plants in the US reaches 25+ years of operation, obsolescence is driving many utilities to implement upgrades to both their safety and non-safety-related Instrumentation and Control (I and C) Systems. Digital technology is the predominant replacement technology for these upgrades. Within the last 15 years, digital control systems have been deployed in non-safety- related control applications at many utilities. In addition, a few utilities have replaced small safety-related systems utilizing digital technology. These systems have shown digital technology to be robust, reliable and simpler to maintain. Based upon this success, acceptance of digital technology has gained momentum with both utilities and regulatory agencies. Today, in an effort to extend the operating lives of their nuclear stations and resolve obsolescence of critical components, utilities are now pursuing digital technology for replacement of their primary safety systems. AREVA is leading this effort in the United States with the first significant digital upgrade of a major safety system. AREVA has previously completed upgrades to safety-related control systems emergency diesel engine controls and governor control systems for a hydro station which serves as the emergency power source for a nuclear station. Currently, AREVA is implementing the replacement of both the Reactor Protection System (RPS) and the Engineered Safety Features Actuation System (ESFAS) on all three units at a US PWR site. (authors)
- Research Organization:
- American Nuclear Society, 555 North Kensington Avenue, La Grange Park, IL 60526 (United States)
- OSTI ID:
- 21021030
- Country of Publication:
- United States
- Language:
- English
Similar Records
Lessons learned in digital upgrade projects digital control system implementation at US nuclear power stations
3D Modeling of Safety-Related Upgrade Pilot Project
3D Modeling of Safety-Related Upgrade Pilot Project
Conference
·
Sat Jul 01 00:00:00 EDT 2006
·
OSTI ID:22030069
3D Modeling of Safety-Related Upgrade Pilot Project
Conference
·
Sun Jul 23 00:00:00 EDT 2023
·
OSTI ID:2557514
3D Modeling of Safety-Related Upgrade Pilot Project
Conference
·
Thu Jul 20 00:00:00 EDT 2023
·
OSTI ID:2403071