skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: A Study of Options for the Deployment of Large Fusion Power Plants

Journal Article · · Fusion Science and Technology
DOI:https://doi.org/10.13182/FST40-1-1· OSTI ID:20845801
 [1];  [2];  [3];  [2];  [3];  [4];  [2];  [5]
  1. Oak Ridge National Laboratory (United States)
  2. Duke Engineering and Services (United States)
  3. Tennessee Valley Authority (United States)
  4. Princeton University (United States)
  5. Boeing Company (United States)

One option for making fusion power plants that could be competitive with other power plants operating during the 21st century is to make them large, e.g., 3 GW(electric) or more, to take advantage of the expected economies of scale. This study examines the effects on electrical utility system hardware, operations, and reliability of incorporating such large generating units. In addition, the study evaluates the use of the coproduction of hydrogen to reduce the grid-supplied electricity and offer the possibility for electrical load-following.The estimated additional cost of electricity (COE) for a large power plant is {approx}5 mills/kW.h. The estimated total COE for 3- to 4-GW(electric) fusion power plants lies in the range of 37 to 60 mills/kW.h.Future hydrogen costs from a variety of sources are estimated to lie in the range of 8 to 10 $/GJ, when allowance is made for some increase in natural gas price and for the possible need for greenhouse gas emission limitations.A number of combinations of fusion plant and electrolyzer were considered, including hot electrolyzers that use heat from the fusion plant. For the optimum cases, hydrogen produced from off-peak power from a 3- to 4-GW(electric) plant is estimated to have a competitive cost. Of particular interest, the cost would also be competitive if some hydrogen were produced during on-peak electricity cost periods. Thus, for a 4-GW(electric) plant, only up to 3 GW(electric) might be supplied to the grid, and load-following would be possible, which would be a benefit to the utility system.

OSTI ID:
20845801
Journal Information:
Fusion Science and Technology, Vol. 40, Issue 1; Other Information: Copyright (c) 2006 American Nuclear Society (ANS), United States, All rights reserved. http://epubs.ans.org/; Country of input: International Atomic Energy Agency (IAEA); ISSN 1536-1055
Country of Publication:
United States
Language:
English

Similar Records

An Assessment of the Economics of Future Electric Power Generation Options and the Implications for Fusion
Journal Article · Thu Mar 15 00:00:00 EST 2001 · Fusion Science and Technology · OSTI ID:20845801

Fusion power economy of scale
Journal Article · Sun Aug 01 00:00:00 EDT 1993 · Fusion Technology; (United States) · OSTI ID:20845801

Production of Fertilizer in a Multipurpose Atomic Power Reactor Complex for Distillation of Sea Water: A Survey
Technical Report · Mon Jul 01 00:00:00 EDT 1963 · OSTI ID:20845801