Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Analysis of a Main-Steam-Line Break in Asco NPP

Journal Article · · Nuclear Technology
OSTI ID:20837845
Culminating in the participation of the Universitat Politecnica de Catalunya in the Organization for Economic Cooperation and Development-Committee on the Safety of Nuclear Installations/Nuclear Science Committee pressurized water reactor (PWR) main-steam-line-break (MSLB) benchmark, we present the analysis with RELAP/PARCS of a double-ended MSLB assumed to occur in the Asco nuclear power plant (NPP). This Spanish NPP, a two-unit 1000-MW(electric) PWR plant of Westinghouse design, has been in normal operation since 1983. The utility uses the RELAP model developed by its analysts to study transients that occurred (or postulated), following its own procedures, giving response to operation-related issues, as well as serving licensing and training purposes. The model is well validated. The present study tests the RELAP/PARCS model of the Asco NPP and, in particular, tests the coupling between the neutronics and the thermal hydraulics; its focus is not licensing or validation.
OSTI ID:
20837845
Journal Information:
Nuclear Technology, Journal Name: Nuclear Technology Journal Issue: 1 Vol. 146; ISSN 0029-5450; ISSN NUTYBB
Country of Publication:
United States
Language:
English