Simulink Model of a New Energy EVG-005 5kW Hydropower Turbine
- University of Alaska Fairbanks
Simulink model for a New Energy 5kW hydropower turbine. ADCP data ("ds_streamwise_7_13.nc") and DC voltage, DC current, and rotor rotation observed from the New Energy EVG-005 Current Energy Converter (CEC) ("electrical_7_13_10ohms.nc") were collected at the Tanana River Test Site (TRTS) near Nenana Alaska. - Data was collected on July 13th, 2023 with a constant 10 ohms resistance applied with a DC load bank. - Simulink model is meant to resemble the electrical setup at the TRTS. - Model is initialized by running the "NewEnergy_2023_10hz.m" Matlab script. Then the Simulink model ("New_Energy_Model_PMSM.slx") can be run. - Results are processed with the "NewEnergy_2023_processing.m" Matlab code. The Matlab results are also saved in the "New_Energy_7_13_model_validation_results.mat" Matlab file. This can be directly loaded into the Matlab Workspace using the "Load()" command. - The timetable variables "electrical_model_downsampled" is the model results and the "electrical_limited" is the experimental data from the TRTS.
- Research Organization:
- Marine and Hydrokinetic Data Repository (MHKDR); University of Alaska Fairbanks
- Sponsoring Organization:
- USDOE Office of Energy Efficiency and Renewable Energy (EERE), Renewable Power Office. Water Power Technologies Office (EE-4WP)
- Contributing Organization:
- University of Alaska Fairbanks
- DOE Contract Number:
- EE0009445
- OSTI ID:
- 2008045
- Report Number(s):
- 511
- Availability:
- MHKDRHelp@nrel.gov
- Country of Publication:
- United States
- Language:
- English