Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Tidal Energy Resource Characterization, Velocity and Turbulence Measurements, Processed Data, Cook Inlet, AK, 2021

Dataset ·
DOI:https://doi.org/10.15473/2007516· OSTI ID:2007516

This submission contains processed datasets from a long-term deployment of 3 moorings and a transect survey of the proposed tidal energy site off the East Forelands in Cook Inlet, AK. The long-term mooring datasets were created from 8 instruments mounted on a Terrasond High Energy Oceanographic Mooring (THEOM) bottom lander and two Mid-Water Mooring (MWM) Stablemoor buoys from 1 July 2021 to 31 August 2021 (60 days). The west-most mooring (MWM1) was deployed at 60.720225 N, 151.436196 W in ~50 m of water. The middle mooring (THEOM) was deployed at 60.720703 N, 151.429500 W in ~52 m of water. The east-most buoy (MWM2) was deployed at 60.720081 N, 151.420896 W in ~50 m of water. Each Stablemoor carried three instruments: 1. A Nortek Vector acoustic Doppler velocimeter (ADV) mounted at the Stablemoor's nose. Data were recorded at 8 Hz on a 5 minute duty cycle every 20 minutes. Data was motion-corrected using the internal IMU and external ADCP bottom-track data and then bin-averaged into 4 minute bins and converted to the Principal (streamwise, cross-stream, vertical) coordinate system. (Note: 30 seconds were trimmed from the beginning and end of each 5 minute duty cycle to account for the filter end-effects from turning on and turning off the IMU.) 2. A down-looking Nortek Signature 1000 kHz acoustic Doppler current profiler (ADCP) mounted in the first Stablemoor instrument well. Data were recorded in 2 Hz with 5-beam burst and bottom-track enabled. Processed data has been averaged into 10 minute bins and converted into the Principal coordinate system. 3. An up-looking Nortek Signature 1000 kHz acoustic Doppler current profiler (ADCP) mounted in the second Stablemoor instrument well. Data were recorded at 4 Hz with 5 beam burst enabled. Processed data has been averaged into 10 minute bins and converted into the Principal coordinate system. Note: the down-facing ADCP on MWM1 failed on July 10th, 2021, only recording 9 days of data. Because ADV motion-correction required bottom track, the ADV from MWM1 also only has 9 days processed. Additionally, only 25 days of data were processed from the MWM2 ADV because it appeared to have been impacted by debris on 7/25. Two instruments were mounted on the THEOM (see MHKDR link further below for THEOM raw data): 4. A Nortek Vector acoustic Doppler velocimeter (ADV). Data were recorded at 8 Hz on a 5 minute duty cycle every 20 minutes. Data was bin-averaged into 5 minute bins, and converted to the Principal coordinate system. 5. A Nortek Signature 500 kHz acoustic Doppler current profiler (ADCP). Data were recorded in 4 Hz in the beam coordinate system from all 5 beams. Processed data has been averaged into 10 minutes bins and converted to the Principal coordinate system.

Research Organization:
Marine and Hydrokinetic Data Repository (MHKDR); Pacific Northwest National Laboratory
Sponsoring Organization:
USDOE Office of Energy Efficiency and Renewable Energy (EERE), Renewable Power Office. Water Power Technologies Office (EE-4WP)
Contributing Organization:
Pacific Northwest National Laboratory
OSTI ID:
2007516
Report Number(s):
475
Availability:
MHKDRHelp@nrel.gov
Country of Publication:
United States
Language:
English