AUP first Pre-Series Cold Mass Installation into the Cryostat
Conference
·
OSTI ID:2005213
- Fermilab
- CERN
For the HiLumi LHC Upgrade (HL-LHC), new high field and large-aperture quadrupole magnets for the low-beta inner triplets (Q1, Q2, Q3) are being built. These new quadrupole magnets are based on Nb3Sn superconducting technology. As part of the US-HiLumi Accelerator Upgrade Project (AUP), ten Cryostat Assemblies (LQXFA) for Q1 and Q3 replacement will be built, tested, and delivered to CERN. The first LQXFA was assembled and tested at Fermi National Accelerator Laboratory (FNAL) during fall 2022 and spring/summer 2023, respectively. This paper summarizes the assembly process and experience of the first LQXFA Cryostat Assembly at FNAL.
- Research Organization:
- Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 2005213
- Report Number(s):
- FERMILAB-CONF-23-532-TD; oai:inspirehep.net:2702484
- Country of Publication:
- United States
- Language:
- English
Similar Records
AUP first Pre-series Cold Mass Installation into the Cryostat
AUP First Pre-Series Cryo-Assembly Design Production and Test Overview
Test Stand Functional Requirements for Testing MQXFA Magnets and Q1/Q3 Cryostat Assemblies (Rev.3)
Conference
·
Mon Sep 11 00:00:00 EDT 2023
·
OSTI ID:2006505
AUP First Pre-Series Cryo-Assembly Design Production and Test Overview
Journal Article
·
Sun May 19 20:00:00 EDT 2024
· IEEE Transactions on Applied Superconductivity
·
OSTI ID:2349037
Test Stand Functional Requirements for Testing MQXFA Magnets and Q1/Q3 Cryostat Assemblies (Rev.3)
Technical Report
·
Mon May 20 00:00:00 EDT 2024
·
OSTI ID:2376205