Title: Feasibility study of the Kafue Gorge Lower Hydroelectric Project. Feasibility report. Volume 1 of 4. Main report. Export trade information

Abstract

This study, conducted by Harza Engineering Company, was funded by the U.S. Trade and Development Agency. The primary objective of the feasibility study was to perform the technical, environmental, economic and financial studies to determine whether or not to proceed with the project. The report covers the preinvestment study that was conducted in 1976 to make comparisons from that period, as well as present and future electrical power demands in order to determine the kinds of equipment and structure needed if the project proceeds. This is Volume I of IV containing the Main Report. It is divided into the following sections: (1) Introduction; (2) Project Setting; (3) Project Description; (4) Construction Schedule and Cost Estimate; (5) Economic and Financial Evaluation; (6) Environmental Assessment.

Publication Date:
Research Org.:
Harza Engineering Co., Chicago, IL (United States)
OSTI Identifier:
200230
Report Number(s):
PB-96-137906/XAB
TRN: 60513164
Resource Type:
Technical Report
Resource Relation:
Other Information: DN: Color illustrations reproduced in black and white. This document was provided to NTIS by the U.S. Trade and Development Agency, Rosslyn, VA. See also Executive Summary, PB--96-137898 and Volume 2, PB--96-137914; PBD: 1 May 1995
Country of Publication:
United States
Language:
English
Subject:
13 HYDRO ENERGY; ZAMBIA; ECONOMIC DEVELOPMENT; HYDROELECTRIC POWER PLANTS; FEASIBILITY STUDIES; COST ESTIMATION; ECONOMIC ANALYSIS

Citation Formats

NONE. Feasibility study of the Kafue Gorge Lower Hydroelectric Project. Feasibility report. Volume 1 of 4. Main report. Export trade information. United States: N. p., 1995. Web.
NONE. Feasibility study of the Kafue Gorge Lower Hydroelectric Project. Feasibility report. Volume 1 of 4. Main report. Export trade information. United States.
NONE. Mon . "Feasibility study of the Kafue Gorge Lower Hydroelectric Project. Feasibility report. Volume 1 of 4. Main report. Export trade information". United States. doi:.
@article{osti_200230,
title = {Feasibility study of the Kafue Gorge Lower Hydroelectric Project. Feasibility report. Volume 1 of 4. Main report. Export trade information},
author = {NONE},
abstractNote = {This study, conducted by Harza Engineering Company, was funded by the U.S. Trade and Development Agency. The primary objective of the feasibility study was to perform the technical, environmental, economic and financial studies to determine whether or not to proceed with the project. The report covers the preinvestment study that was conducted in 1976 to make comparisons from that period, as well as present and future electrical power demands in order to determine the kinds of equipment and structure needed if the project proceeds. This is Volume I of IV containing the Main Report. It is divided into the following sections: (1) Introduction; (2) Project Setting; (3) Project Description; (4) Construction Schedule and Cost Estimate; (5) Economic and Financial Evaluation; (6) Environmental Assessment.},
doi = {},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Mon May 01 00:00:00 EDT 1995},
month = {Mon May 01 00:00:00 EDT 1995}
}

Technical Report:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that may hold this item. Keep in mind that many technical reports are not cataloged in WorldCat.

Save / Share:
  • This study, conducted by Harza Engineering Company, was funded by the U.S. Trade and Development Agency. The primary objective of the feasibility study was to perform the technical, environmental, economic and financial studies to determine whether or not to proceed with the project. The report covers the preinvestment study that was conducted in 1976 to make comparisons from that period, as well as present and future electric power demands in order to determine the kinds of equipment and structure needed if the project proceeds. This is Volume IV of IV containing Appendices G through I. It is divided as follows:more » (G) Environmental Assessment; (H) Archaeological and Palaentological Survey; (I) Load Flow Studies.« less
  • This study, conducted by Harza Engineering Company, was funded by the U.S. Trade and Development Agency. The primary objective of the feasibility study was to perform the technical, environmental, economic and financial studies to determine whether or not to proceed with the project. The report covers the preinvestment study that was conducted in 1976 to make comparisons from that period, as well as present and future electrical power demands in order to determine the kinds of equipment and structure needed if the project proceeds. This is Volume II of IV containing Appendices A and B. Appendix A covers Hydrology. Appendixmore » B covers Geology and Geotechnical Investigations.« less
  • This study, conducted by Harza Engineering Company, was funded by the U.S. Trade and Development Agency. The primary objective of the feasibility study was to perform the technical, environmental, economic and financial studies to determine whether or not to proceed with the project. The report covers the preinvestment study that was conducted in 1976 to make comparisons from that period, as well as present and future electrical power demands in order to determine the kinds of equipment and structure needed if the project proceeds. This is Volume III of IV containing Appendices C through F. It is divided as follows:more » (C) Zambia Energy Sector; (D) Historical and Future Electricity Demand; (E) Alternative Project Developments; (F) Cost Estimates.« less
  • This study, conducted by Harza Engineering Company, was funded by the U.S. Trade and Development Agency. The primary objective of the feasibility study was to perform the technical, environmental, economic and financial studies to determine whether or not to proceed with the project. The report covers the preinvestment study that was conducted in 1976 to make comparisons from that period, as well as present and future electrical power demands in order to determine the kinds of equipment and structure needed if the project proceeds. This is the Executive Summary and is divided into the following sections: (1) Introduction; (2) Electricmore » Power Sector; (3) Recommended Project; (4) Reservoir Operations Studies; (5) Construction Cost Estimates; (6) Economic Analysis; (7) Financial Analysis; (8) Expansion Program; (9) Environmental Assessment.« less
  • The report was prepared for Nepal Electricity Authority (NEA). The primary objective of the study was to compare several alternative development schemes to drive an optimum development plan for exploiting the hydroelectric potential of the Upper Arun River, to be further investigated in phase 2 of the feasibility study. The scope of work included reviewing the original project concepts establishing development alternatives investigations in the following fields: Toposurvey Mapping; Geology Geotechnics; Hydrology; Power Market; and Plan formulations.