ECKG Kladno project: First IPP in the Czech Republic
The Energy Center Kladno project is the first independent power producer (IPP) project to be financed in the Czech Republic, one of Europe's most rapidly evolving markets. The total financing is $401 million and is structured in three currencies; Czech crowns, German marks, and US dollars. This paper will focus on: Enhanced technology to meet energy demands; Execution to meet the ambitious; and Overall project status. The coal and gas fired plant will produce a total of 343 MW to provide electricity and heat to the town of Kladno, west of Prague. The new plant will be located within the existing ECK facility and the project encompasses demolition, upgrading, and rebuilding. The base load will be from two coal-fired 135 MW circulating fluidized bed (CFB) boilers and peaking capacity from the gas-fired combustion (66 MW) turbine. The CFB's will fire a range of low sulfur brown coal supplied from the local mining company Ceskomoravske Doly (CMD). The new CFB's were designed to meet the overall steam demands specified by ECKG. The CFB's design features include in-furnace heat transfer surface and a split backpass that utilizes a biasing damper to allow for control of both the superheat and reheat steam temperatures. The various CFB auxiliary systems will be discussed in the paper as well as the flue gas particulate collection equipment.
- Research Organization:
- Combustion Engineering Inc. (US)
- OSTI ID:
- 20006787
- Report Number(s):
- CONF-990534--
- Country of Publication:
- United States
- Language:
- English
Similar Records
Doswell dispatchable 663-MW IPP covers Virginia Power's peaks
Advanced NO{sub x} measures and control systems in Czech Republic